The superstructure consists of two central spans 145-m (476-ft)-long and two approach spans 90-m (295-ft)-long. The roadway geometry calls for both a vertical curve and a horizontal curve along the entire length of the bridge. The substructure consists of cast-in-place rectangular hollow piers on bored pile foundations and spread footings.
The structure will be erected by the balanced cantilever method using form travelers.