It is a multiple-span “extradosed” bridge with a central plane of stay cables. The superstructure is monolithically connected to cast-in-place pier shafts supported on 45-m (148-ft)-deep caissons or well foundations. The circular caisson caps are located at riverbed level to reduce scour.
Construction of the bridge superstructure was critical due to high current and flooding after the monsoon season.
This project received the American Segmental Bridge Institute (ASBI) 2007 Bridge Award of Excellence and the CELSOC 2008 Engineering Excellence Merit Award.